LS25 / Eligible costs

All costs that are directly attributable to the project and are regarded as commonly required in the respective scientific fields are eligible for funding. Please also consider your organization’s internal guidelines for eligible expenses/costs.

Personnel costs

WWTF is dedicated to funding researchers. Hence, the larger share of the project’s budget should be allocated to personnel costs for researchers working on the project.

Non-personnel costs

Running costs for basic infrastructure (telephone costs, rents) as well as costs for the acquisition of infrastructure and basic equipment are not eligible for funding, as these should be covered by the category “overhead costs”. The following categories of non-personnel costs are eligible for funding:

Non-personnel costs should not exceed 40% of the overall budget.

Indirect costs (overheads)

 WWTF pays a maximum of 20% overhead.

Overhead is calculated as a percentage of the direct costs of the project (i.e., personnel + non-personnel costs). Please note that WWTF offers the maximum 20% overhead lump sum to compensate for all administration costs. This means that flat fees for payroll or project accounting are not eligible. The total funding volume is calculated as direct plus indirect costs.

Applicants are required to comply with the overhead regulations of the involved institutions.


Revision #2
Created 20 December 2024 12:32:57 by Grace Liu
Updated 31 January 2025 14:42:21 by Grace Liu